|
|
|
| Panoramic view of the soutwest portion of Kalavasos - Ayios Dhimitrios. This portion of the site is across the modern road from the main excavations. |
The team gets the gear ready to start surveying. |
Sturt helps set up the survey grid. |
|
|
|
| Kevin H. runs transect lines. |
Rachel runs transect lines. |
Everyone pitches in to get the grid set up. |
|
|
|
| View of the grid looking north from the southwest corner. |
Kevin H. and Chris set out pegs for more survey units. |
Jeff conducts the radar survey. |